欧美 日韩 国产在线_国产精品毛片一区内射_18禁在线看 欧美_japanese在线播放国产_日韩一区二区无码高清_亚洲人成人综合无码_久久亚洲日韩欧美综合_国产亚洲日朝欧美…_再用点力今晚随你弄_成人夜视频在线观看免费

 

SHANXI XINGDATONG

INDUSTRIES CO.,LTD.

山西興達通?機電設(shè)備有限公司

ABOUT US
關(guān)于我們

公司簡介

Back-swing Continuous Spiral Welded Pipe Line
來源: | 作者:xindatong | 發(fā)布時間: 2017-04-17 | 770 次瀏覽 | 分享到:
Back-swing continuous SSAW Pipe Mill
Uncoiler bending strip tail at the end of coil, shearing&butt-welding unit using fission structure in butt-welding part in order to bevel the joint plate, quick edge milling machine


This pipe mill is a back-swing continuous SSAW Pipe Mill which has flying welding car and reliable progressive technology. The mill uses the leading-edge techniques of our company owns that including: Uncoiler bending strip tail at the end of coil, shearing&butt-welding unit using fission structure in butt-welding part in order to bevel the joint plate, quick edge milling machine and so on. These new techniques ensure the process and technology of mill, the quality and cost of production have reached the domestic and international advanced level.

This pipe mill is a whole set of mill which integrated machinery, electrical and hydraulic control system.

During the designing and manufacturing progress, the safeguard measure for equipments and operators were set for safety. For example: There are four sets of pressure sensor in the screw-down device which belongs to levelling machine; According to the sudden change of thickness, the self-protection unit is used in the depress device of pinching machine and main driver. Due to using the field-bus control system, operator can set the parameter of each machine with digitization setting screen. Through each power protection device and sensing element in the hardware unit, all kinds of operation parameters will be transmitted to the control centre for analytical processing, and then adjust the running status in time, all of these parameters will display in the HMI so that the operator can adjust the running status without delay, all of above measures effectively improve the operability and safety of the whole mill.

Forming process introduction:

Load the coil with crane onto the coil-car's carrier roller at first, and move the car into the center-line of Uncoiler, move the cone-head to clamp the coil tightly, centring the center-line of coil match with Main Driver line through operating buttons, then move the Peeler close to the coil and start the coil car roller motor to rotate in order to open the head of coil with Peeler working together, after the coil head goes into the straighten rollers the first bending could be done, then the coil head keeps going forward to Pinching and Levelling machine. After the coil head goes into the pinching rollers, depress down the pinching roller and feed the steel strip forward, the steel strip will go through the seven levelling rollers and keep going, the center-line of steel strip will keep centring with mill center-line by the Side Guide roller devices. After Shearing&Butt-welding machine, the steel strip will be sheared and butt-welded, then go into the Pinching roller machine and move forward into looper. All of the above unit machines is fixed on the Flying Welding Car which keep synchronous with Main Driver and realize the continuous producing for the pipe making work. After the looper the steel strip moves forward into Main Driver, the Main Driver supplys the total power force for forming force which overcome all kinds of resistance force e.g. Edge milling and forming resistance. Edge miller is consist of Facing miller and Bevelling miller, ensure the edge of steel strip continued and smooth,  prepare for the on-line submerged arc welding and ensure the welding quality. After edge milling the steel strip will move into Prebending machine and Guide Board device which keep moving steady into the Forming machine, the forming process is finished by No.1, No.2, No.3 forming roller which bend the steel strip directly, and the sizing process is finished by No.4, No.5, No.6, No.7, No.8 forming roller. During the forming process the Lincoln welder will weld the connecting two edges inside and outside. After inside and outside welding parts the pipe will move into Pay-off table area, the pipe will be cut to length by Plasma cutter and Length Sensor device, then the pipe will be transported out of Pay-off table by Moving Car, repeat the cutting and moving off work over and over, ensure the continuous producing. 

山西省太原市萬柏林區(qū)漪汾街10號麥特摩爾大廈1004室

Email:wbl68wbl@163.com

手機:13994223533    86-0351-7995983

網(wǎng)址:?www.www.atbaidu.cn   www.sxxdtjd.com

  • 姓名
  • 聯(lián)系方式*
  • 留言意見*
提交
山西興達通機電設(shè)備有限公司秉承“和諧務實、開拓創(chuàng)新”的企業(yè)宗旨,為國內(nèi)外廣大用戶提高質(zhì)量的設(shè)備、技術(shù)和服務,攜手共進,共創(chuàng)佳績!
主站蜘蛛池模板: 国产无吗又粗又长又硬又爽 | 嫖农村寡妇一区二区视频 | ⅩXXX。ZZZZ国产 | 黑人玩弄人妻一区二区三区久久 | 成人久久精品人妻一区二区三区 | 水蜜桃视频在线播放 | 日韩精品在线观看一区二区三区 | 亚洲丰满熟妇喷水猛烈进入A片 | 91久久久久毛片一级A片直播 | 特极午夜电影视频录相 | 人人天天夜夜狠狠 | 国产精品久久久久久久毛片 | 成人伊人国产在线视频a区 亚洲第一日韩人妻变态AV | 国产熟妇婬乱一区二区 | 仙踪林呦性XXX精品A片 | 最新中文字幕在线 | 久久精品99精品国产欧美 | 国产亲子乱A片免费视频 | 蜜桃精品免费福利视频 | 熟女视频在线一二三区 | 91成人 在线观看喷潮-百度 | 成人午夜黄色毛片电影 | 91午夜夜伦鲁鲁片无码影视 | 黄片大全在线观看 | 四川寡妇高潮AAA片毛片 | 新疆少妇一级毛片 | 国产成人无码区亚洲A片356p | 影音先锋成人无码在线观看 | 午夜福利免费体验试看 | 免费看成人AAAAA片视频 | 成人网站在线观看免费无码流出的 | 浙江妇搡BBBB搡BBBB | 国产毛片毛片毛片毛片毛片毛片毛片毛片 | 国产精品一爱豆AV | 搬淫家国产免费99在线 | 国产二区在线播放 | 免费无码婬片AAAA片直播黑人 | 成人免费A片 白浆樱桃视频 | 5080在线无码 | 999色色人妻门999 | 韩国无马中文字幕一区 |